Every fixed-price bid is a bet that prices will sit still

A bid is a snapshot of your costs on the day you wrote it. Here's how to stop last month's number from eating this month's margin.

By Ray Okonkwo · Money & Business6 min read
Every fixed-price bid is a bet that prices will sit still

Quick answer: Put an expiration date on every bid. Price from this week's supplier quotes, not last job's invoice. Buy the volatile materials early or write a pass-through for them. Then compare every closed job to its bid, so you see the leak in one job instead of ten.

The bid that was right when you wrote it

Say you quoted a kitchen remodel at $42,000 in March. Your numbers were honest. You priced cabinets, countertop, flooring, electrical and your crew's hours off what you knew that week.

The customer thought about it for five weeks. Signed in late April. You start in June.

By June the cabinet supplier has sent a price notice. Your electrician's rate went up. Diesel's higher, so every trip to the yard costs more. None of it is dramatic on its own. Together, it can quietly turn a 15 percent margin into a 9 percent one before anybody lifts a hammer.

Nobody did anything wrong. You just treated a number as permanent when it was a photograph.

Know where the drift lives

Not every cost moves at the same speed. Sort your jobs into the pieces that change fast and the pieces that don't.

  • Fast movers: lumber, copper, fuel, anything shipped, anything with a surcharge line on the invoice.
  • Medium movers: subcontractor rates, equipment rental, insurance, your own labor once you give a raise.
  • Slow movers: your overhead, your software, your lease.

The fast movers are where a stale bid hurts. A job that's 40 percent materials is far more exposed than one that's 10 percent materials. Look at your last five jobs and write down what percent of each was materials. You'll know in ten minutes how much a price jump can cost you.

Fix one: a shelf life on the paper

Every bid gets a "valid through" date. Thirty days is common. Fifteen if your materials are jumpy.

Put it near the total, not in the fine print. "This price is good through June 14. After that we'll re-confirm material costs before starting."

Some customers will grumble. Let them. A bid with no expiration is a free option you've handed the customer: they can wait, shop it around, and come back when it suits them, while you carry all the price risk.

When someone shows up on day 45 saying "we'd like to go with your quote," don't pretend it's still good. Say: "Glad to. Let me refresh the materials and get you an updated number by Friday." Then do it. Most people respect that. The ones who don't would have been a headache on the job anyway.

Fix two: price from today, not from memory

The most common leak isn't the old bid. It's the new bid built from the old invoice.

You remember what a pallet of pavers cost on the last job, so you plug it in. But that was four months ago. Call the supplier. Get a written or emailed quote for anything that's more than a few percent of the job. It takes twenty minutes and it's the cheapest insurance you'll buy this year.

Ask the supplier one more question: "How long is this good for?" If they'll hold it for 30 days, your bid can match. If they'll hold it for 7, your bid can't promise 30 without padding.

Fix three: lock it or pass it through

Once a job is signed, you've got two honest ways to handle the volatile stuff.

Buy early. If the contract is signed and the deposit's in, order the big-ticket materials now. Lock the price, store the goods, and the June price notice becomes somebody else's problem. This works when you have the space and the deposit covers the purchase. It doesn't work if you're floating the money out of your own pocket. Check that against your cash before you do it.

Write an escalation clause. Name the specific materials, a baseline price, and a threshold. For example, if the documented cost of the named item goes up more than a set percent between signing and purchase, the difference is passed to the customer at cost. Keep it narrow. A clause covering "any increase in anything" reads like a trap, and customers treat it that way.

Have a lawyer in your state look at the wording once, then reuse it. Some contracts, especially public or bonded work, restrict or forbid these clauses, so read what you're signing. And be honest about the trade-off: in a tight competitive bid, a clause can cost you the job. Some operators would rather bake a contingency into the number and win. Either approach works. Ignoring the problem doesn't.

Fix four: stop padding, start itemizing

The lazy answer is to add 10 percent to everything. It feels safe. It also loses you jobs you should have won and hides the real risk from you.

A better habit is a visible contingency line for the volatile items only. Customers will accept "materials allowance, $3,200, unused portion credited back" far more readily than a mystery markup. It's honest, and it keeps your relationship intact when the number moves.

Fix five: hold the line on what you signed

Here's where character comes in. Once you've signed a fixed price with no escalation clause, that's the price. A man keeps his word even when it costs him.

Don't go back to the customer in July asking for more because lumber jumped. You took the risk, and you were paid for taking it. Finish the job right, eat the hit, and fix the next bid.

The reverse is just as true. Don't let a customer use your honesty as leverage. If they want changes, upgrades or a different scope, that's a change order with its own price. Write it down before the work starts, not after.

Fix six: audit every closed job

The leak you can't see is the one that keeps running. After every job, put two numbers side by side: what you estimated for materials and labor, and what they actually cost.

You don't need software. A single sheet with one row per job works fine:

  • Bid total and estimated margin
  • Actual cost and actual margin
  • The biggest line that moved, and which direction

After five or six jobs, patterns jump out. Maybe it's always concrete. Maybe it's your own hours running long. Maybe it's trips to the supply house nobody priced. That pattern tells you where to tighten next time.

Fold it into the monthly habit in Read your own profit and loss in ten minutes a month. And if you already keep a weekly scorecard, add one line for margin on jobs in progress. The weekly numbers that keep a small business out of trouble covers what belongs on that page.

One more tie-in: a deposit and a draw schedule protect you from price drift and slow payers at the same time. Most late invoices are a process problem, not a people problem walks through the setup.

Do this before Friday

Pull every open bid you've sent in the last 60 days. Anything without an expiration date, call the customer and add one. Anything over 30 days old, reprice the materials before they say yes.

Then open your last closed job and compare the bid to the actual. That one comparison will tell you more about your margins than another month of guessing.

The market doesn't care what you wrote on the estimate. You're the one who has to keep up with it.

Ray Okonkwo

Money & Business

Former commercial banker turned small-business owner. Covers salary, credit, margins and the arithmetic nobody does before signing.

Watch

Worth an hour of your evening

More from Business.

From channels we rate. Plays on YouTube.

    Alex HormoziNov 18

    The person spending $1,000 is probably a different person.

    Alex HormoziNov 17

    Your sales team might be selling to the wrong people.

    Alex HormoziNov 17

    If you want to change a culture, change its heroes.

    TEDJul 23

    How to Claim Your Leadership Power | Michael Timms | TED