That job made money until you counted the redo hours

The estimate said 33 percent margin. The crew's Saturday said otherwise. How to find the real number and stop paying for the same work twice.

By Ray Okonkwo · Money & Business5 min read
business section

Quick answer: Put a separate code on your time sheets for any hour spent redoing finished work. Close out every job against the estimate, with rework as its own line. After ten jobs you'll know what each type of work really costs, and you can price it in.

Take a deck quoted at $9,600. Materials come to $3,400. You figure 80 labor hours at a loaded $38 an hour, which is $3,040. Cost is $6,440, so you're sitting on $3,160 of margin, about 33 percent. Nice job.

Then the ledger flashing gets done wrong and has to come off. Two posts are out of square and get re-set. A run of boards is cut short and replaced for $310. The crew makes two extra trips for fuel and parts, call it $120. Three weeks later the homeowner calls about a gap, and somebody burns half a day on the callback.

That's 26 extra hours, or $988, plus $310 in material and $120 in trips. The job cost you $1,418 more than the estimate said. Your margin is $1,742, or 18 percent. Nobody put that on an invoice, and nobody will.

Why you never see it

Payroll doesn't care what the hours were for. The crew got paid for 106 hours instead of 80, the checks cleared, and the bank balance looked fine. The loss shows up as "labor ran a little high," which gets blamed on the weather, the customer, or a slow Tuesday.

Rework hides in plain sight because it doesn't feel like a cost. It feels like conscientiousness. The crew stayed late and fixed it, the customer's happy, everybody's a hero. Meanwhile you've given away a third of your profit on that job and you're about to quote the next one off the same optimistic numbers.

There's a second cost that never reaches a spreadsheet. The crew that spent Saturday redoing flashing didn't start the next job on Monday. That job slid a week, and so did the money.

Count it, without hunting for someone to blame

Add one code to your time sheets or your app: R. Any hour spent redoing something that was already done once gets an R. A fixed mistake, a replaced part, a trip back for something forgotten, a callback. If it's the second time somebody touched it, it's an R.

Say this to the crew out loud: the code isn't a confession. The point is the count. If the guy who logs eight honest R hours gets chewed out, you'll see zero R hours from then on, and you'll be back to guessing. Reward the person who flags a problem early, while it's a two-hour fix and not a two-day one.

Then close out every job on one page:

  • Quoted hours against actual hours
  • Rework hours, on their own line
  • Materials replaced or wasted
  • Callbacks in the first 60 days
  • Final margin, estimated against real

It takes ten minutes. If that sounds like a lot, compare it to what one unexamined job just cost you. If you already read your numbers on a schedule, this slots right in next to the weekly numbers that keep a small business out of trouble. A notebook works if software is a hassle.

Sort the redo by cause

After a handful of close-outs, sort every R into one of four piles. Each pile has a different fix, and treating them all as "the crew needs to be more careful" is how you fix none of them.

The estimate missed something. Hidden rot, a wall that wasn't plumb, a panel that couldn't take the load. Fix: a better site walk and a short checklist of what to look for before quoting.

Information got lost between the person who sold it and the people who built it. The customer said "no trim on the east side" at the kitchen table and the crew never heard. Fix: a one-page scope, in writing, with photos, handed to the crew lead before day one.

Skill or supervision. Somebody was asked to do a job they hadn't done before and nobody checked early. Fix: look at the work at the first hour, not the last one. This is on you as much as on them.

Materials or suppliers. The wrong size showed up and went in anyway, or the cheaper lot warped. Fix: check deliveries against the order before they leave the truck, and stop buying from the supplier who's wrong every third time.

Most shops find one pile dwarfs the others. Fix that one first.

Price it into the next quote

You don't need a magic padding percentage. You need your own history. After ten or so close-outs, you'll see that decks run one way, bathrooms another, and a certain kind of repair job bleeds hours every time. Add an allowance by job type, based on what your shop actually burns.

A flat 10 percent on everything is lazy. It overcharges the clean jobs, loses you bids, and still under-covers the ugly ones.

And be straight with customers about what rework is and isn't. If the redo is yours, you eat it. That's the job, and it's how you keep a name worth having. If the redo is because the customer changed the tile at the last minute, that's a change order, and it gets priced and signed before anyone picks up a tool. Plenty of good operators lose money by being nice about this. Serving your customer well includes holding the line on what you agreed to build. Being generous is fine. Being quietly robbed is a habit that eventually closes the shop.

If late payment is part of your cash problem too, most late invoices are a process problem, not a people problem, and the same close-out page helps there.

When rework is worth it

Not every redo is a failure of the system. Sometimes you eat a few hours on purpose: a first job for a builder who'll send you twenty more, or a flaw nobody else would ever notice but you'd see every time you drove past. Doing it over to leave it right is a fair call. Just make it a decision you see on the page, not a loss you discover at tax time.

Counting also has a cost. A three-man outfit doesn't need a dashboard. It needs a notebook on the dash and the habit of writing the number down.

The verdict

The estimate is a guess you made before the work. The close-out is the verdict after it. Most operators are very good at the first and have never read the second.

Pull your last five finished jobs this week. Add the rework hours to each. Find out which of them you'd quote again at the same price.

Ray Okonkwo

Money & Business

Former commercial banker turned small-business owner. Covers salary, credit, margins and the arithmetic nobody does before signing.

Watch

Worth an hour of your evening

More from Business.

From channels we rate. Plays on YouTube.

    Alex HormoziNov 28

    Every business can have five one-on-one clients.

    Alex HormoziNov 27

    Say the price, then let them consider it.

    Alex HormoziNov 27

    It’s easier to sell one really expensive thing to one really rich person than many cheap things to

    Philip VanDusenJun 14

    7 Secrets to Branding Your Small Business - What Every Small Business Needs to Succeed