Your bids run low because you never read the receipts

The gap between the materials you quoted and the materials you bought is where your profit goes. Here's how to find it in fifteen minutes a job.

By Ray Okonkwo · Money & Business5 min read
Your bids run low because you never read the receipts

Quick answer: Give every job its own name on every receipt. When the job closes, set the materials you bid beside the materials you bought and write down the difference. After five jobs you'll know your real number, and it will be higher than the one in your head.

The leak isn't the big stuff

You don't misprice the lumber. You priced the lumber off a supplier quote and you were close.

You misprice everything around it. The second trip for the fitting that wasn't in the truck. The fasteners you grabbed "while you were there." Two blades, a tube of caulk, a roll of tape, a box of gloves. The dump fee. The fuel for three runs when you planned one.

None of it feels like materials. It feels like the cost of working. So it never makes it into the bid, and it never makes it into anybody's invoice either.

One example, with the numbers shown

This is an illustration, not a benchmark. Your trade and your region will look different.

Say you bid a bathroom tile job at $1,850 in materials. The real spend looked like this:

  • Tile, backer board, thinset and grout from the bid: $1,740
  • Extra thinset and a second bag of grout after a bad mix: $64
  • Blades, spacers, sponges, sealer: $88
  • Two added supply-house trips at roughly 20 minutes and a few dollars of gas each: $45 in fuel, plus your time
  • Haul-off and dump fee: $75
  • Sales tax you forgot to carry on the small purchases: $38

That's $2,050 before you count a minute of your own time, against a bid of $1,850. You're $200 under, which is about 11 percent of that materials line. The client never saw it and you never saw it. It came out of your pay.

Run that on twenty jobs a year and it stops being a rounding error.

Set it up so it costs you nothing

Don't buy software for this. A system you'll actually keep up beats a good one you won't.

Name the job at the counter. Open a contractor account at your supply house and give every ticket a job name or PO number. Smith Bath. Henderson Deck. Most counters will print it on the invoice without being asked twice. That one habit does most of the work.

Photograph the small receipts before you leave the lot. The hardware store run, the paint counter, the dump scale ticket. Write the job name on the paper with the pen in your visor, then take the picture. If you wait until Friday, the receipt is in the cupholder under a coffee ring and the job it belonged to is gone.

Pay for materials from the business account. Not the personal card, not the one you use for groceries. If you haven't got a clean setup yet, one business account and a Friday habit beat any software, and that piece will get you there in an afternoon.

Keep one running sheet per job. A paper folder or a single spreadsheet tab. Date, vendor, amount, what it was. Nothing fancier than that.

Close every job with a fifteen-minute review

This is the part that changes your pricing, and it's the part everybody skips. You're tired, the check cleared, and the next job starts Monday.

Do it anyway. Fifteen minutes, same day the job wraps.

  1. Total the actual materials spend from the folder.
  2. Put the bid number beside it.
  3. Write the gap, in dollars and as a percent of the bid.
  4. Sort the overage into two piles: things that were avoidable (you forgot to order, you cut wrong) and things that were predictable (the small consumables, extra trips, disposal).
  5. Write one sentence about what you'd do differently.

The avoidable pile is a lesson. The predictable pile is a line item you left off your bid.

What to do with the number you find

After five jobs, look at the predictable pile as a percent of each bid. If it keeps landing between, say, 8 and 12 percent of the materials line, you've found a fixed allowance. Put it on the bid as its own line. Call it shop supplies and incidentals, or fold it into your materials number and say nothing. Either way, stop eating it.

Then check your markup. Say you pay $2,050 for materials and you add 15 percent. That's $307.50 on top, for $2,357.50 billed. If the markup was supposed to cover your time buying, hauling and handling, it's now covering the leak too. Those are two different jobs for the same money. Let it do the first one.

A word on terms. Markup is the percent you add to your cost. Margin is the percent of the final price you keep. They aren't the same number, and mixing them up is its own way to underprice. Your CPA or a bookkeeper can sit down with you for an hour and set this straight for your business.

Prices move between the bid and the buy

You quoted copper in March and bought it in May. Lumber, wire, fixtures and appliances can all move on you while a client takes three weeks to decide.

Put a shelf life on the bid. Thirty days is common. For long lead jobs, ask a local attorney to help you write a clause that lets you adjust for material price changes above an agreed threshold. Clients usually accept it when it's explained plainly and written down before the work starts. Don't improvise the wording yourself.

The tax side, briefly

Clean job-level records also make tax time easier, because every material purchase already has a date, a vendor, an amount and a purpose. How those costs are treated is a question for your CPA, not for a magazine. But ask them one thing: what records do they want from you? Most will tell you in a sentence, and you'll be ahead of nearly everybody walking in.

If your April bill still comes as a surprise, read quarterly taxes and the one rule that ends the April ambush.

Why this matters more than the rate

A lot of guys work harder when the money's tight. Longer days, more jobs, weekends on a site. That's the instinct of a man who doesn't quit, and it's a good instinct pointed at the wrong target. Your seventy-hour week is a pricing problem, and a hidden materials leak is one of the quietest ways to build one.

You can't fix what you haven't measured. Start with the next job. Write its name on the first receipt.

By the fifth, you'll know exactly what you've been paying to work for free.

Ray Okonkwo

Money & Business

Former commercial banker turned small-business owner. Covers salary, credit, margins and the arithmetic nobody does before signing.

Watch

Worth an hour of your evening

More from Self-Employed Men.

From channels we rate. Plays on YouTube.

    Chris CroftAug 23

    Put your prices up! Self employed advice

    The Money Guy ShowFeb 18

    Valuable Tips for Being Successfully Self-Employed!

    The Money Guy ShowOct 7

    What Is the Best Way to Invest as a Self-Employed Individual?

    Essential CraftsmanMay 13

    The Truth About Going Self-Employed in the Trades